Schedule Your Free Consultation

Home › Services › Shower Remodel

Shower Remodeling in Sherman Oaks & Los Angeles

A shower is a waterproof box first and a tiled one second. We rebuild it from the pan up.

CSLB Lic. #1072452 · Bonded · 4.9★ on Google · Best of Houzz 2022 & 2023

What a DR Development shower remodel project includes

Most shower failures we see are not tile failures. They are pan and waterproofing failures under tile that looked fine — the classic 1970s Valley shower with a hot-mop pan and no bonded membrane.

Our shower remodels replace the pan, the valve and the waterproofing, then tile and glass. Same footprint or a larger one; tub-to-shower conversions are the most common version.

  • New pre-sloped pan and linear or center drain
  • Bonded sheet or liquid waterproofing
  • Pressure-balanced or thermostatic valves
  • Niches, benches and half-walls
  • Porcelain, ceramic and stone tile
  • Frameless glass enclosures
  • Curbless and low-threshold entries
  • Exhaust fan sizing
Valve note: old two-handle shower valves don’t meet current anti-scald code. Any shower rebuild in Los Angeles gets a pressure-balanced or thermostatic valve — a small cost that also stops the shower going cold when someone flushes.

Same footprint rebuild

Everything comes out to the studs; pan, waterproofing, backer board, tile and glass go back in. Seven to ten working days.

Enlarging the shower

Often done by absorbing an old tub or a closet. Adds framing, plumbing relocation and a permit, and usually the shower everyone actually wanted.

Curbless showers

A level entry needs the floor recessed or the drain lowered, so it’s planned at the framing stage. Excellent for aging in place and for small bathrooms that want to feel bigger.

What drives the price

Shower size, tile choice and pattern, glass (frameless costs more than framed), niche and bench details, valve quality, and whether the footprint changes. Waterproofing is not where we let clients save money.

How the project runs

Walkthrough & estimate

We measure, listen, and send a written line-item estimate — free.

Design & selections

Layout, materials and fixtures locked before demolition.

Permits & build

We pull the permit, schedule inspections and run the crew.

Final walk & sign-off

Punch list, final inspection, and you keep our number.

Shower Remodel FAQs

How do I know my shower pan is failing?

Soft or discolored drywall outside the shower, loose tile at the floor, or a musty smell under the vanity next door. We can moisture-test it.

Can you install a linear drain?

Yes, and in a curbless shower it’s usually the right choice. It needs the floor sloped in one direction, which we build in.

How long before I can use the new shower?

Grout and silicone need about 48–72 hours after completion.

More answers on our FAQ page, or browse recent projects and client reviews. Ask about financing options at your walkthrough.

Related services

Further reading

Where we do this work

From our Sherman Oaks office we serve the San Fernando Valley, the Westside and the foothill cities. Popular areas for shower remodel:

Ready when you are

Shower Remodel estimates are free and in writing.