We walk through a lot of Valley kitchens that were remodeled once already, badly. The mistakes repeat. Here are the ones that cost the most, and what to do instead.
1. Skipping the permit to save time
An unpermitted kitchen with moved plumbing or a removed wall becomes a problem at sale, at refinance, and occasionally at the ceiling. LADBS permits are not the slow part of a project if they’re filed while cabinets are on order. What needs a permit.
2. Demolishing before the cabinets are ordered
The single most common cause of a kitchen sitting gutted for two months. Order first, demolish to the delivery date.
3. Choosing the island size by the furniture
Clearances first: 42 inches on working sides, 36 minimum elsewhere, dishwasher and oven doors able to open. Then seating. Island planning.
4. Ignoring the electrical panel
A new kitchen adds circuits: island, dishwasher, disposal, microwave, lighting, sometimes an induction range. A 100-amp panel in a 1950s Sherman Oaks house often can’t take them. Find out before demo, not at rough inspection.
5. Too many upper cabinets, not enough drawers
Drawers hold more and show everything. Most kitchens we rebuild end up with more drawer bases and fewer doors than the original.
6. Lighting as an afterthought
Recessed cans alone leave the counters in shadow. Under-cabinet lighting on the backsplash wall, pendants over the island, and dimmers everywhere — planned at rough electrical, not after.
7. Quartz where it will scorch or fade
Quartz is excellent indoors and wrong outdoors and next to a hot pan. Match the material to the use. Countertop guide.
8. Tiling before the counters are in
The counter thickness sets the bottom line of the backsplash. Counters first, tile second, always.
9. Hiring by the lowest number on one line
A one-line quote hides what’s excluded. Compare line-item estimates, check the licence (ours: CSLB #1072452), and ask who pulls the permit.
10. Not planning where you’ll cook for six weeks
A temporary kitchen — microwave, hot plate, a sink you can reach — is the difference between a tolerable remodel and a miserable one. We set one up on day one.