Vanity, mirror, lighting and tile — the four things a bathroom is judged on, installed together so they line up.
CSLB Lic. #1072452 · Bonded · 4.9★ on Google · Best of Houzz 2022 & 2023Not every bathroom needs a gut remodel. A new vanity with real drawers, a proper mirror with lighting at face height, and new floor tile can change a bathroom in a week.
We install stock, semi-custom and custom vanities, move plumbing to suit a new sink position, add the electrical the new lighting needs, and tile floors and walls with the same waterproofing standards as a full remodel.
Out with the 30-inch builder box; in with something that fits the room and has drawers. Usually one to two days plus counter templating.
Old tile comes up, subfloor is checked, an uncoupling membrane goes down, tile goes on. Two to three days. This is also when we fix the toilet flange everyone ignores.
Half-height tile behind the vanity and toilet gives the durability of a full remodel without the cost.
Vanity construction and size, countertop, faucets, mirror and lighting, tile material and area, and whether plumbing moves. Custom vanities cost more but fit rooms stock never will.
We measure, listen, and send a written line-item estimate — free.
Layout, materials and fixtures locked before demolition.
We pull the permit, schedule inspections and run the crew.
Punch list, final inspection, and you keep our number.
Yes. We’ll tell you first if the plumbing rough-in doesn’t match and what it will take to make it.
We recommend it when the floor is redone — the flange gets reset properly and the toilet comes off anyway.
About a week.
More answers on our FAQ page, or browse recent projects and client reviews. Ask about financing options at your walkthrough.
From our Sherman Oaks office we serve the San Fernando Valley, the Westside and the foothill cities. Popular areas for bathroom vanity & tile:
Ready when you are