Primary Bathroom Remodels in Sherman Oaks & Los Angeles

The bathroom you use twice a day, rebuilt around how you actually use it.

CSLB Lic. #1072452 · Bonded · 4.9★ on Google · Best of Houzz 2022 & 2023

What a DR Development primary bathroom remodel project includes

Primary bathrooms in Valley houses were often an afterthought — a 5 × 8 room off the bedroom with a single vanity and a tub-shower. The modern request is the opposite: a large shower, two sinks, real storage, and sometimes a freestanding tub.

Getting that into the existing square footage usually means borrowing from a closet or a hallway, which makes this a layout project as much as a finish project. We plan the plumbing and framing changes first and the tile second.

  • Layout redesign and closet reconfiguration
  • Large walk-in or curbless showers
  • Double vanities with real drawer storage
  • Freestanding tubs and fillers
  • Heated floors and towel bars
  • Lighting design and dimming
  • Ventilation sized to the room
  • Frameless glass and mirrors
Plumbing on a slab: many Valley primary baths sit on slab foundations. Moving a toilet or shower drain means cutting the slab — routine for us, but it is the reason a layout change costs more than a same-footprint remodel.

Same footprint, new everything

Fixtures stay roughly where they are; everything else changes. Four weeks is typical.

Reconfigured layout

Walls move, plumbing moves, often a closet is absorbed. Six to eight weeks with permits and inspections.

Suite-level work

Bathroom plus closet plus bedroom lighting and doors — one project, one disruption. Often the best value if you’re doing the bathroom anyway.

What drives the price

Whether plumbing moves, shower size and glass, vanity construction, tile coverage, tub choice, and fixture quality. Heated floors and good lighting are the two upgrades clients thank us for most.

How the project runs

Walkthrough & estimate

We measure, listen, and send a written line-item estimate — free.

Design & selections

Layout, materials and fixtures locked before demolition.

Permits & build

We pull the permit, schedule inspections and run the crew.

Final walk & sign-off

Punch list, final inspection, and you keep our number.

Primary Bathroom Remodel FAQs

Should I keep a tub in the primary bath?

If the house has another tub, most clients now choose a bigger shower instead. If it doesn’t, keep one somewhere.

How long will we be without the bathroom?

Four to eight weeks depending on scope. We keep another bathroom fully usable throughout.

Do you do the closet too?

Yes. Reconfiguring the closet is often what makes the bathroom layout work.

More answers on our FAQ page, or browse recent projects and client reviews. Ask about financing options at your walkthrough.

Related services

Further reading

Where we do this work

From our Sherman Oaks office we serve the San Fernando Valley, the Westside and the foothill cities. Popular areas for primary bathroom remodel:

Ready when you are

Primary Bathroom Remodel estimates are free and in writing.