Schedule Your Free Consultation

Home › Services › Open Floor Plan & Wall Removal

Open Floor Plan Conversions & Load-Bearing Wall Removal in Los Angeles

Most Valley houses were built as a series of rooms. Opening them up is a structural project — beam, permit, inspection — and we do the whole thing.

CSLB Lic. #1072452 · Bonded · 4.9★ on Google · Best of Houzz 2022 & 2023

What a DR Development open floor plan & wall removal project includes

The single most common request we get from owners of 1950s–70s ranch houses in Sherman Oaks, Encino and Studio City is to open the kitchen to the living or family room. Almost always, the wall in the way is bearing.

Removing a bearing wall means an engineer sizes a beam, the beam is set on posts that carry load to the foundation, and LADBS inspects the framing before it’s covered. Done properly it’s routine. Done without a permit it’s a problem at sale time and, occasionally, a sagging ceiling.

  • Structural engineer’s calculations and drawings
  • LADBS or city permit and inspections
  • Flush or drop beam options
  • Temporary shoring during demolition
  • Post and footing work where required
  • Electrical and plumbing rerouting from the old wall
  • Ceiling, drywall and flooring patching
  • Finish carpentry so the beam reads as intended
Permits: any bearing-wall removal in the City of Los Angeles requires a permit with engineered plans, and LADBS inspects the framing. Some hillside lots and older houses need additional seismic detailing. We manage the drawings and the inspections.

Is the wall bearing?

Walls running perpendicular to the ceiling joists usually are; walls parallel to them usually aren’t. We check in the attic and crawlspace before quoting — a non-bearing wall is a two-day job, a bearing wall is a three-week one.

Flush beam or drop beam

A drop beam is faster and cheaper but shows below the ceiling; a flush beam is hidden in the ceiling framing and costs more. Most of our clients choose flush for a truly open room.

What’s inside the wall

Old kitchen walls carry plumbing vents, ducts and wiring. Rerouting them is often the largest part of the job and the part that’s impossible to price without opening the wall.

What drives the price

Beam length and whether it’s flush or drop, engineering, what services run through the wall, flooring and ceiling patching, and whether the kitchen is being remodeled at the same time (which is when this makes the most sense).

How the project runs

Walkthrough & estimate

We measure, listen, and send a written line-item estimate — free.

Design & selections

Layout, materials and fixtures locked before demolition.

Permits & build

We pull the permit, schedule inspections and run the crew.

Final walk & sign-off

Punch list, final inspection, and you keep our number.

Open Floor Plan & Wall Removal FAQs

Do I need an engineer?

Yes for any bearing wall. LADBS requires stamped calculations, and we won’t open a bearing wall without them.

How long does it take?

Two to four weeks including engineering and inspection scheduling, longer if plumbing has to move.

Can you match the flooring where the wall was?

Sometimes. Hardwood can be laced in; tile usually can’t be matched exactly, which is why this is often paired with new flooring.

More answers on our FAQ page, or browse recent projects and client reviews. Ask about financing options at your walkthrough.

Related services

Further reading

Where we do this work

From our Sherman Oaks office we serve the San Fernando Valley, the Westside and the foothill cities. Popular areas for open floor plan & wall removal:

Ready when you are

Open Floor Plan & Wall Removal estimates are free and in writing.