Schedule Your Free Consultation

Home › Services › Second Story Addition

Second Story Additions in Sherman Oaks & Los Angeles

When the lot is full, the only way is up. A second story doubles the house on the same footprint — with the engineering that makes it safe.

CSLB Lic. #1072452 · Bonded · 4.9★ on Google · Best of Houzz 2022 & 2023

What a DR Development second story addition project includes

Second-story additions are the biggest project a Valley house can take on. They involve removing the roof, strengthening the foundation and first-floor framing to carry the new load, and building a full floor above — often while the family lives elsewhere.

Done well, they transform a 1,400 square-foot ranch into a 2,600 square-foot house with a primary suite and bedrooms upstairs and an open plan below. Done badly they are the horror stories you’ve read about. We do the engineering first.

  • Feasibility review of foundation and framing
  • Architectural and structural engineering
  • Zoning height and hillside review
  • Foundation reinforcement
  • Roof removal and weather protection
  • Full second-floor framing and stairs
  • Plumbing, electrical and HVAC for two floors
  • Exterior and interior finish
Hillside lots: south of Ventura Boulevard in Sherman Oaks, Encino and Studio City, the Baseline Hillside Ordinance limits height and floor area. Flat Valley lots have simpler height limits. We check this before design.

Full second story

A new floor over the whole footprint. Maximum space, maximum structural work.

Partial second story

A new floor over part of the house — often the back — keeping some single-story rooms. Less foundation work and a more interesting roofline.

Over the garage

A suite or office above an attached garage. The smallest second-story project and a popular one.

What drives the price

Square footage, foundation reinforcement needed, roof complexity, number of bathrooms upstairs, stair location, and finish. Engineering and permits are a larger share than in a single-story addition.

How the project runs

Walkthrough & estimate

We measure, listen, and send a written line-item estimate — free.

Design & selections

Layout, materials and fixtures locked before demolition.

Permits & build

We pull the permit, schedule inspections and run the crew.

Final walk & sign-off

Punch list, final inspection, and you keep our number.

Second Story Addition FAQs

Can my foundation support a second story?

Often not without reinforcement; an engineer’s evaluation tells us. That evaluation is the first step.

How long does it take?

Six to twelve months including plan check. Weather-protection planning matters during the roof-off phase.

Can we live in the house?

Rarely during the roof-off and framing phases. Plan on being out for two to four months.

More answers on our FAQ page, or browse recent projects and client reviews. Ask about financing options at your walkthrough.

Related services

Further reading

Where we do this work

From our Sherman Oaks office we serve the San Fernando Valley, the Westside and the foothill cities. Popular areas for second story addition:

Ready when you are

Second Story Addition estimates are free and in writing.