Schedule Your Free Consultation

Home › Services › Bathroom Remodeling

Bathroom Remodeling in Sherman Oaks & Los Angeles

Waterproofed, permitted, finished bathrooms — the room where cutting corners shows up as a leak two years later.

CSLB Lic. #1072452 · Bonded · 4.9★ on Google · Best of Houzz 2022 & 2023

What a DR Development bathroom remodeling project includes

Bathrooms are small rooms with every trade in them: plumbing, electrical, framing, waterproofing, tile, glass, ventilation. Doing them well means doing them in the right order, and that is what a general contractor is for.

We remodel primary baths, hall baths, kids’ baths and powder rooms across the Valley and the Westside — most often 1950s–80s bathrooms with original tile, cast-iron tubs and 30-inch vanities.

  • Full gut and rebuild or fixture-level updates
  • Tub-to-shower and walk-in shower conversions
  • Waterproofing systems (Schluter, Laticrete or equivalent)
  • Porcelain, ceramic and natural stone tile
  • Custom vanities and medicine cabinets
  • Frameless glass enclosures
  • Exhaust fan and lighting upgrades
  • Plumbing and electrical to current code
Permits in Los Angeles: a bathroom remodel that moves plumbing, adds a circuit, or changes the shower footprint is permitted through LADBS. Fixture-for-fixture swaps generally are not. Ventilation and GFCI requirements apply either way, and we bring them up to code while the walls are open.

The primary bath

Usually the biggest single-room project after the kitchen: a larger shower, double vanity, better storage and lighting. Often paired with a closet reconfiguration.

Hall and kids’ baths

Durability first: tile that hides water spots, a tub that survives, storage at kid height. Usually two to three weeks.

Powder rooms

Small, high-impact, and the place to spend on a great vanity and tile because there’s so little of it.

What drives the price

Whether plumbing moves, tile material and coverage, shower size and glass, vanity construction, and fixtures. A bathroom in the existing footprint with mid-range materials is a very different number from a reconfigured primary suite with a curbless shower.

How the project runs

Walkthrough & estimate

We measure, listen, and send a written line-item estimate — free.

Design & selections

Layout, materials and fixtures locked before demolition.

Permits & build

We pull the permit, schedule inspections and run the crew.

Final walk & sign-off

Punch list, final inspection, and you keep our number.

Bathroom Remodeling FAQs

How long does a bathroom remodel take?

Two to three weeks for a hall bath in the same footprint; four to six for a primary bath with layout changes and custom glass.

Can we keep using the bathroom during the work?

Not the one being remodeled. If it’s the only bathroom, we discuss staging and a temporary solution before starting.

Do you handle the waterproofing?

Yes, and it’s the part we care most about. We use bonded waterproofing systems and flood-test showers before tile goes on.

More answers on our FAQ page, or browse recent projects and client reviews. Ask about financing options at your walkthrough.

Related services

Further reading

Where we do this work

From our Sherman Oaks office we serve the San Fernando Valley, the Westside and the foothill cities. Popular areas for bathroom remodeling:

Ready when you are

Bathroom Remodeling estimates are free and in writing.