Schedule Your Free Consultation

Home › Services › Tub-to-Shower Conversion

Tub-to-Shower Conversions in Sherman Oaks & Los Angeles

The bathtub nobody uses becomes a real, tiled, waterproofed shower — not an acrylic overlay glued over the old one.

CSLB Lic. #1072452 · Bonded · 4.9★ on Google · Best of Houzz 2022 & 2023

What a DR Development tub-to-shower conversion project includes

A standard 60-inch tub alcove converts into a 60 × 30 or 60 × 32 shower with the drain moved, a new pan, a proper valve and tile. It is the most requested bathroom project in the Valley and, done properly, one of the best-value ones.

We don’t do overlay systems. They trap moisture, can’t be repaired, and cost nearly as much as doing it right.

  • Tub removal and disposal
  • Drain relocation and new pan
  • Bonded waterproofing
  • Tile walls and floor
  • Frameless glass or a fixed panel
  • Grab bars blocked for later
  • Niche and bench options
  • Fan and lighting updates
Keep one tub: if you’re converting the only tub in the house, think about resale — most buyers with young children want at least one bathtub. We usually recommend converting the primary and keeping a tub in the hall bath.

What changes

The tub, the drain location, the valve, and the waterproofing. The walls above the old tub surround come off to the studs so the new waterproofing is continuous.

Low-threshold and curbless

A standard curb is 4–5 inches. We can build a low threshold in the same footprint or a curbless entry with floor work, which is the right answer for aging in place.

Glass

A fixed panel keeps the opening wide and is easiest to clean; a door contains spray better. Frameless is the standard for our clients.

What drives the price

Tile and glass choices mostly. Moving the drain, adding a niche, and choosing a linear drain add labor. Curbless adds floor work.

How the project runs

Walkthrough & estimate

We measure, listen, and send a written line-item estimate — free.

Design & selections

Layout, materials and fixtures locked before demolition.

Permits & build

We pull the permit, schedule inspections and run the crew.

Final walk & sign-off

Punch list, final inspection, and you keep our number.

Tub-to-Shower Conversion FAQs

Can this be done in a week?

Seven to ten working days is typical, including curing time before glass is installed.

Do I need a permit?

In the City of Los Angeles, relocating the drain and replacing the valve is permitted plumbing work. We handle it.

Will a shower hurt my resale value?

Not if the house still has one tub. If it doesn’t, we’ll talk about it before you decide.

More answers on our FAQ page, or browse recent projects and client reviews. Ask about financing options at your walkthrough.

Related services

Further reading

Where we do this work

From our Sherman Oaks office we serve the San Fernando Valley, the Westside and the foothill cities. Popular areas for tub-to-shower conversion:

Ready when you are

Tub-to-Shower Conversion estimates are free and in writing.