A shower is a waterproof box first and a tiled one second. We rebuild it from the pan up.
CSLB Lic. #1072452 · Bonded · 4.9★ on Google · Best of Houzz 2022 & 2023Most shower failures we see are not tile failures. They are pan and waterproofing failures under tile that looked fine — the classic 1970s Valley shower with a hot-mop pan and no bonded membrane.
Our shower remodels replace the pan, the valve and the waterproofing, then tile and glass. Same footprint or a larger one; tub-to-shower conversions are the most common version.
Everything comes out to the studs; pan, waterproofing, backer board, tile and glass go back in. Seven to ten working days.
Often done by absorbing an old tub or a closet. Adds framing, plumbing relocation and a permit, and usually the shower everyone actually wanted.
A level entry needs the floor recessed or the drain lowered, so it’s planned at the framing stage. Excellent for aging in place and for small bathrooms that want to feel bigger.
Shower size, tile choice and pattern, glass (frameless costs more than framed), niche and bench details, valve quality, and whether the footprint changes. Waterproofing is not where we let clients save money.
We measure, listen, and send a written line-item estimate — free.
Layout, materials and fixtures locked before demolition.
We pull the permit, schedule inspections and run the crew.
Punch list, final inspection, and you keep our number.
Soft or discolored drywall outside the shower, loose tile at the floor, or a musty smell under the vanity next door. We can moisture-test it.
Yes, and in a curbless shower it’s usually the right choice. It needs the floor sloped in one direction, which we build in.
Grout and silicone need about 48–72 hours after completion.
More answers on our FAQ page, or browse recent projects and client reviews. Ask about financing options at your walkthrough.
From our Sherman Oaks office we serve the San Fernando Valley, the Westside and the foothill cities. Popular areas for shower remodel:
Ready when you are