Schedule Your Free Consultation

Home › Services › Kitchen Remodeling

Kitchen Remodeling in Sherman Oaks & Los Angeles

Licensed, permitted, one-contractor kitchen remodels — from cabinet-and-counter refreshes to full layout changes with new plumbing and electrical.

CSLB Lic. #1072452 · Bonded · 4.9★ on Google · Best of Houzz 2022 & 2023

What a DR Development kitchen remodeling project includes

Every kitchen we build runs under one contract and one license. The same team handles demolition, framing changes, rough plumbing and electrical, drywall, cabinet installation, countertops, tile, lighting and the final inspection — so you are not coordinating three trades from your driveway.

Most of our kitchen work is in the Valley: Sherman Oaks, Encino, Studio City, Tarzana and the neighborhoods around them, where the typical starting point is a 1950s–70s galley or U-shaped kitchen that has been through one or two cosmetic updates and is now ready for a real rebuild.

  • Layout and design consultation
  • Permit application and inspections (LADBS or city)
  • Custom or semi-custom cabinetry
  • Quartz, granite and porcelain countertops
  • Plumbing, gas and electrical relocation
  • Tile, flooring and lighting
  • Islands, peninsulas and pantries
  • Appliance fitting and finish carpentry
Permits in Sherman Oaks: most Valley neighborhoods are inside the City of Los Angeles, so kitchen work that moves plumbing, gas or electrical is permitted through LADBS — the Van Nuys office covers this area. Like-for-like cabinet and counter swaps usually don’t need one. Requirements change; we confirm scope with the department before demolition.

The refresh

Cabinet refinishing or new doors, new countertops, backsplash, sink and faucet, lighting. The layout stays and the kitchen looks new. Typically two to three weeks on site.

The rebuild

New cabinets and counters in the existing footprint, with electrical and plumbing brought up to current code where the work requires it. Four to six weeks is common.

The layout change

Walls opened, an island added, plumbing and gas relocated, sometimes a window or door moved. This is a permitted structural project and usually runs eight to twelve weeks depending on inspections.

What drives the price

Cabinet construction (stock, semi-custom or custom), countertop material, whether plumbing or electrical moves, structural work, and the appliance package. All of it is itemized in the written estimate so you can see where the money goes and what to change if the number needs to come down.

How the project runs

Walkthrough & estimate

We measure, listen, and send a written line-item estimate — free.

Design & selections

Layout, materials and fixtures locked before demolition.

Permits & build

We pull the permit, schedule inspections and run the crew.

Final walk & sign-off

Punch list, final inspection, and you keep our number.

Kitchen Remodeling FAQs

Can I live in the house during a kitchen remodel?

Most clients do. We set up a temporary kitchen zone, seal the work area with dust barriers, and keep water on outside the kitchen.

Do I need a permit to replace cabinets and counters?

Like-for-like cabinets and counters generally don’t, but any change to plumbing, gas or electrical does. We tell you which category your project falls into before work starts.

How long does a kitchen remodel take in Los Angeles?

Two to twelve weeks depending on scope. LADBS inspection scheduling is the usual variable, which is why we book inspections the day the stage is ready.

More answers on our FAQ page, or browse recent projects and client reviews. Ask about financing options at your walkthrough.

Related services

Further reading

Where we do this work

From our Sherman Oaks office we serve the San Fernando Valley, the Westside and the foothill cities. Popular areas for kitchen remodeling:

Ready when you are

Kitchen Remodeling estimates are free and in writing.