Schedule Your Free Consultation

Short answer: if the project changes structure, plumbing, gas, electrical or the footprint of the house, it needs a permit. If it’s cosmetic — paint, flooring, cabinets in the same place, a like-for-like countertop — it usually doesn’t. The details matter, and so does which office you’re dealing with.

Which office?

Most of the San Fernando Valley — Sherman Oaks, Encino, Studio City, Tarzana, Woodland Hills, Van Nuys, North Hollywood, Reseda, Northridge and the rest — is inside the City of Los Angeles, so permits go through the Los Angeles Department of Building and Safety (LADBS). The Van Nuys office serves the Valley; the West LA office serves Bel Air and Brentwood.

Burbank, Glendale, Calabasas, Hidden Hills, Agoura Hills, Beverly Hills, West Hollywood, La Cañada Flintridge and Pasadena are their own cities with their own building departments and, in several cases, design review. Toluca Lake and Westlake Village straddle boundaries — the same street can be two jurisdictions. Our service area pages name the office for each.

Projects that need a permit

  • Removing or altering a bearing wall (with engineering)
  • Room additions, second stories, ADUs and garage conversions
  • Moving or adding plumbing, gas lines or drains — including an island sink or a relocated shower
  • New electrical circuits or a panel upgrade
  • Changing a shower footprint or a tub-to-shower conversion (plumbing)
  • Patio covers attached to the house or over 120 sq ft; decks over 30 inches above grade
  • Retaining walls over 4 feet (3 with a surcharge); significant grading
  • Window or door openings that change size

Projects that usually don’t

  • Painting, flooring, interior trim
  • Cabinet refinishing or replacement in the same footprint
  • Countertop replacement without plumbing changes
  • Fixture-for-fixture swaps (faucet, toilet, light fixture)
  • Small freestanding pergolas under 120 sq ft

“Usually” is doing work in those lists. Requirements change and some neighborhoods — HPOZs, hillside areas, historic districts — add review to things that are otherwise exempt. We confirm scope with the department before we quote.

What skipping it costs

Unpermitted work surfaces at sale (buyers’ inspectors look for it), at refinance and appraisal, with insurance claims, and — for structural work — occasionally in the ceiling. LADBS can require unpermitted work to be opened up for inspection. The permit is a small percentage of a project; the exposure isn’t.

How the process actually runs

Drawings (and engineering where structure changes) are submitted for plan check. Once approved, the permit is issued and work starts. Inspections happen at defined stages — foundation, framing, rough plumbing/electrical, insulation, final. We schedule each inspection the day the stage is ready, which is the main thing keeping a project on time.

Every DR Development project that needs a permit gets one, filed and inspected under our licence, CSLB #1072452. Ask us what your project needs.