Schedule Your Free Consultation

Home › Services › Garage Conversion

Garage Conversions & Garage ADUs in Sherman Oaks & Los Angeles

The 400 square feet you use for boxes becomes a studio, an office or a rentable ADU — the fastest square footage a Valley house can add.

CSLB Lic. #1072452 · Bonded · 4.9★ on Google · Best of Houzz 2022 & 2023

What a DR Development garage conversion project includes

Nearly every Valley house has a two-car garage, and a large share of them haven’t held a car in years. California law now lets a garage be converted to an ADU without replacing the parking, which removed the biggest obstacle.

A conversion is a real construction project: the slab is checked and often insulated, the walls are framed out and insulated, windows and a proper door go in, and the kitchen and bathroom of an ADU need plumbing that usually has to be trenched in.

  • LADBS permit (ADU track or standard)
  • Slab evaluation and moisture barrier
  • Insulated walls, ceiling and floor
  • Windows, egress and entry door
  • Electrical sub-panel and outlets
  • Bathroom and kitchenette plumbing
  • Mini-split heating and cooling
  • Exterior finish where the garage door was
Garage door opening: the big opening is framed in and finished to match the house — stucco, a window, or a set of French doors. It’s the detail that decides whether the conversion looks like a conversion.

Garage ADU

Full dwelling with kitchen and bath. Rentable, and the most common conversion we build.

Office, gym or studio

No kitchen, sometimes a half bath. A simpler permit and a faster build — three to six weeks.

Family room tie-in

Attached garages can be opened to the house as a family room. This one keeps the house as a single dwelling.

What drives the price

ADU versus non-dwelling use, plumbing distance to the main line, electrical capacity, slab condition, and finish level. A garage ADU is usually well under the cost of a detached one.

How the project runs

Walkthrough & estimate

We measure, listen, and send a written line-item estimate — free.

Design & selections

Layout, materials and fixtures locked before demolition.

Permits & build

We pull the permit, schedule inspections and run the crew.

Final walk & sign-off

Punch list, final inspection, and you keep our number.

Garage Conversion FAQs

Do I lose my parking?

For an ADU conversion in Los Angeles, replacement parking is not required. For other uses, zoning may still require covered parking — we check.

Is a garage floor good enough for living space?

Usually with a moisture barrier and insulation; sometimes it needs leveling. We test it first.

How long does it take?

Two to four months for an ADU including permit; less for a non-dwelling conversion.

More answers on our FAQ page, or browse recent projects and client reviews. Ask about financing options at your walkthrough.

Related services

Further reading

Where we do this work

From our Sherman Oaks office we serve the San Fernando Valley, the Westside and the foothill cities. Popular areas for garage conversion:

Ready when you are

Garage Conversion estimates are free and in writing.