Schedule Your Free Consultation

Home › Services › ADU Construction

ADU Construction in Sherman Oaks & Los Angeles

A second home on your lot — for family, for rent, or for later — built to the state ADU rules that make it possible.

CSLB Lic. #1072452 · Bonded · 4.9★ on Google · Best of Houzz 2022 & 2023

What a DR Development ADU construction project includes

California’s ADU laws let most single-family lots in Los Angeles add a detached or attached accessory dwelling unit, and the City of Los Angeles processes them through a dedicated LADBS track. The Valley’s wide lots make it one of the most ADU-friendly parts of the city.

We build detached ADUs, attached ADUs, and garage conversions, handling the design, the permit, the utility connections and the build. Every ADU is a complete dwelling: kitchen, bathroom, its own entrance, and its own address.

  • Feasibility and site review
  • Design and permit set (LADBS ADU track)
  • Foundation and framing
  • Kitchen and bathroom
  • Separate entrance and utilities
  • Electrical service and panel review
  • Fire separation where attached
  • Landscape and access
State rules: California allows ADUs up to 800 sq ft with reduced setbacks on most lots, and larger units subject to local limits; cities must approve compliant applications within 60 days. Rules change regularly — we confirm the current standards with LADBS at the start of every ADU project.

Detached ADU

A new small house in the backyard, typically 400–1,200 sq ft. The most flexible and most private option.

Attached ADU

Added to the main house with its own entrance. Shares a wall and some systems; often the most economical new-construction ADU.

Garage conversion ADU

The existing garage becomes a dwelling. Fastest and usually the least expensive path — see our garage conversion page.

What drives the price

Size, detached versus attached, foundation, kitchen and bath scope, utility upgrades (a new electrical panel is common), and site access. ADUs are priced per project, not per square foot, because the fixed costs — permit, utilities, kitchen, bath — don’t scale.

How the project runs

Walkthrough & estimate

We measure, listen, and send a written line-item estimate — free.

Design & selections

Layout, materials and fixtures locked before demolition.

Permits & build

We pull the permit, schedule inspections and run the crew.

Final walk & sign-off

Punch list, final inspection, and you keep our number.

ADU Construction FAQs

How big can my ADU be?

On most Los Angeles lots, up to 1,200 sq ft detached; state law guarantees at least 800 sq ft regardless of local rules. We check your zone.

Can I rent out an ADU?

Yes, for terms of 30 days or more in the City of Los Angeles.

How long does an ADU take?

Six to twelve months including permits, depending on type. Garage conversions are fastest.

More answers on our FAQ page, or browse recent projects and client reviews. Ask about financing options at your walkthrough.

Related services

Further reading

Where we do this work

From our Sherman Oaks office we serve the San Fernando Valley, the Westside and the foothill cities. Popular areas for ADU construction:

Ready when you are

ADU Construction estimates are free and in writing.