Schedule Your Free Consultation

Home › Services › Primary Suite Addition

Primary Suite Additions in Sherman Oaks & Los Angeles

A bedroom, a bathroom and a closet you didn’t have — added to the back of the house and permitted like it should be.

CSLB Lic. #1072452 · Bonded · 4.9★ on Google · Best of Houzz 2022 & 2023

What a DR Development primary suite addition project includes

The most common addition we build is a primary suite: a 300–500 square-foot bedroom with an en-suite bath and a walk-in closet, usually off the rear of a single-story house.

Because it includes a bathroom, it is a plumbing project as much as a framing one. We run new supply and drain lines, size the water heater, and extend HVAC — then match the exterior so the house looks like it was always this size.

  • Design to fit the lot and the existing house
  • Engineering and permit set
  • Foundation and framing
  • Full bathroom with shower and double vanity
  • Walk-in closet built out
  • HVAC and electrical extension
  • Exterior matching
  • Interior tie-in and doors
Setbacks and lot coverage: rear additions in Los Angeles R1 zones typically need a 15-foot rear setback and must stay within lot-coverage limits. We survey the lot before drawing anything.

Rear suite

Off the back of the house through a hallway or the old bedroom wall. The most common and most efficient layout.

Converting and extending

Sometimes the best suite is the existing back bedroom extended by 10–12 feet with a new bathroom. Less new foundation, same result.

Second-story suite

When the lot won’t allow a rear addition, a suite over the garage or the back of the house. See second-story additions.

What drives the price

Square footage, bathroom scope, foundation type, closet build-out, HVAC changes, and finish level. The bathroom is typically a third of the total.

How the project runs

Walkthrough & estimate

We measure, listen, and send a written line-item estimate — free.

Design & selections

Layout, materials and fixtures locked before demolition.

Permits & build

We pull the permit, schedule inspections and run the crew.

Final walk & sign-off

Punch list, final inspection, and you keep our number.

Primary Suite Addition FAQs

How long does a primary suite addition take?

Four to six months including permits. Plan check is the variable.

Can you add a suite on a slab house?

Yes. The addition is usually built on a new slab tied to the existing one.

Can we stay in the house?

Usually, since the work is outside the existing walls until the tie-in at the end.

More answers on our FAQ page, or browse recent projects and client reviews. Ask about financing options at your walkthrough.

Related services

Further reading

Where we do this work

From our Sherman Oaks office we serve the San Fernando Valley, the Westside and the foothill cities. Popular areas for primary suite addition:

Ready when you are

Primary Suite Addition estimates are free and in writing.