The bathroom you use twice a day, rebuilt around how you actually use it.
CSLB Lic. #1072452 · Bonded · 4.9★ on Google · Best of Houzz 2022 & 2023Primary bathrooms in Valley houses were often an afterthought — a 5 × 8 room off the bedroom with a single vanity and a tub-shower. The modern request is the opposite: a large shower, two sinks, real storage, and sometimes a freestanding tub.
Getting that into the existing square footage usually means borrowing from a closet or a hallway, which makes this a layout project as much as a finish project. We plan the plumbing and framing changes first and the tile second.
Fixtures stay roughly where they are; everything else changes. Four weeks is typical.
Walls move, plumbing moves, often a closet is absorbed. Six to eight weeks with permits and inspections.
Bathroom plus closet plus bedroom lighting and doors — one project, one disruption. Often the best value if you’re doing the bathroom anyway.
Whether plumbing moves, shower size and glass, vanity construction, tile coverage, tub choice, and fixture quality. Heated floors and good lighting are the two upgrades clients thank us for most.
We measure, listen, and send a written line-item estimate — free.
Layout, materials and fixtures locked before demolition.
We pull the permit, schedule inspections and run the crew.
Punch list, final inspection, and you keep our number.
If the house has another tub, most clients now choose a bigger shower instead. If it doesn’t, keep one somewhere.
Four to eight weeks depending on scope. We keep another bathroom fully usable throughout.
Yes. Reconfiguring the closet is often what makes the bathroom layout work.
More answers on our FAQ page, or browse recent projects and client reviews. Ask about financing options at your walkthrough.
From our Sherman Oaks office we serve the San Fernando Valley, the Westside and the foothill cities. Popular areas for primary bathroom remodel: