Schedule Your Free Consultation

Home › Services › Decks

Deck Builders in Sherman Oaks & Los Angeles

Level ground is rare south of Ventura Boulevard. Decks are how hillside homes get a backyard — and they are structures that need real footings and a permit.

CSLB Lic. #1072452 · Bonded · 4.9★ on Google · Best of Houzz 2022 & 2023

What a DR Development decks project includes

In the flats, a deck is an alternative to a paver patio. In the hills of Sherman Oaks, Encino and Studio City, it’s often the only outdoor space a house can have, cantilevered or posted over a slope.

We build composite and wood decks on engineered footings, with railings that meet code, stairs, lighting, and the ledger flashing that keeps water out of the house.

  • Composite and hardwood decking
  • Hillside and elevated decks
  • Engineered footings and posts
  • Ledger flashing and attachment
  • Cable, glass and wood railings
  • Stairs and landings
  • Deck lighting
  • Pool and spa decks
Permits: any deck more than 30 inches above grade needs a permit and engineered footings in Los Angeles. Hillside decks may need soils review. Railing height (42 inches) and stair rules apply.

Composite decks

Low maintenance, consistent color, no splinters. The default for most of our clients.

Wood decks

Redwood, cedar or hardwood for the look and feel. Needs periodic finishing.

Hillside decks

Posts on drilled footings down the slope, sometimes a view railing in glass or cable. The projects where engineering matters most.

What drives the price

Size, height above grade, footing type, decking material, railing type, stairs and lighting. Hillside decks cost more per square foot because of the footings and access.

How the project runs

Walkthrough & estimate

We measure, listen, and send a written line-item estimate — free.

Design & selections

Layout, materials and fixtures locked before demolition.

Permits & build

We pull the permit, schedule inspections and run the crew.

Final walk & sign-off

Punch list, final inspection, and you keep our number.

Decks FAQs

How long does a deck take?

Two to four weeks for a typical deck; longer for hillside work with drilled footings.

Composite or wood?

Composite for low maintenance; wood for the feel. We’ll show you samples in the sun.

Can you replace just the boards?

If the framing is sound, yes — resurfacing an old deck with composite is a common project.

More answers on our FAQ page, or browse recent projects and client reviews. Ask about financing options at your walkthrough.

Related services

Further reading

Where we do this work

From our Sherman Oaks office we serve the San Fernando Valley, the Westside and the foothill cities. Popular areas for decks:

Ready when you are

Decks estimates are free and in writing.