Level ground is rare south of Ventura Boulevard. Decks are how hillside homes get a backyard — and they are structures that need real footings and a permit.
CSLB Lic. #1072452 · Bonded · 4.9★ on Google · Best of Houzz 2022 & 2023In the flats, a deck is an alternative to a paver patio. In the hills of Sherman Oaks, Encino and Studio City, it’s often the only outdoor space a house can have, cantilevered or posted over a slope.
We build composite and wood decks on engineered footings, with railings that meet code, stairs, lighting, and the ledger flashing that keeps water out of the house.
Low maintenance, consistent color, no splinters. The default for most of our clients.
Redwood, cedar or hardwood for the look and feel. Needs periodic finishing.
Posts on drilled footings down the slope, sometimes a view railing in glass or cable. The projects where engineering matters most.
Size, height above grade, footing type, decking material, railing type, stairs and lighting. Hillside decks cost more per square foot because of the footings and access.
We measure, listen, and send a written line-item estimate — free.
Layout, materials and fixtures locked before demolition.
We pull the permit, schedule inspections and run the crew.
Punch list, final inspection, and you keep our number.
Two to four weeks for a typical deck; longer for hillside work with drilled footings.
Composite for low maintenance; wood for the feel. We’ll show you samples in the sun.
If the framing is sound, yes — resurfacing an old deck with composite is a common project.
More answers on our FAQ page, or browse recent projects and client reviews. Ask about financing options at your walkthrough.
From our Sherman Oaks office we serve the San Fernando Valley, the Westside and the foothill cities. Popular areas for decks:
Ready when you are