Schedule Your Free Consultation

Home › Services › Room Additions

Room Addition Contractors in Sherman Oaks & Los Angeles

More house on the same lot: engineered, permitted, and tied into the existing structure so it doesn’t look added on.

CSLB Lic. #1072452 · Bonded · 4.9★ on Google · Best of Houzz 2022 & 2023

What a DR Development room additions project includes

Additions are the answer when the layout works but the house is simply too small — a third bedroom, a family room off the kitchen, a primary suite on the back. In the Valley’s single-story neighborhoods, a rear addition is usually the most straightforward way to add space.

The work is foundation, framing, roof, and matching — matching the roofline, the stucco, the windows and the floor height so the addition reads as original. We handle the drawings, the engineering and the LADBS or city permit.

  • Architectural drawings and structural engineering
  • Zoning and setback review
  • LADBS or city permit and inspections
  • Foundation and slab work
  • Framing, roofing and stucco matching
  • Electrical, plumbing and HVAC extension
  • Windows, doors and finish
  • Interior tie-in and flooring
Zoning: most Valley lots are R1 with front, side and rear setbacks and a maximum floor-area ratio. Hillside lots have additional limits. We check what your lot allows before you fall in love with a plan.

Rear and side additions

The workhorse: a new room or suite off the back of the house. Single-story, slab or raised foundation to match, usually three to five months from permit to finish.

Bump-outs

A few feet added to a kitchen or bathroom can change the whole room. Cheaper per square foot than a full addition when there’s an existing roof to extend.

Second stories

When the lot is out of room, the roof comes off. See our second-story addition page.

What drives the price

Square footage, foundation type, roof complexity, how many walls of the existing house are opened, plumbing (a bathroom in the addition adds a lot), and finish level. Engineering and permit fees are itemized separately.

How the project runs

Walkthrough & estimate

We measure, listen, and send a written line-item estimate — free.

Design & selections

Layout, materials and fixtures locked before demolition.

Permits & build

We pull the permit, schedule inspections and run the crew.

Final walk & sign-off

Punch list, final inspection, and you keep our number.

Room Additions FAQs

How long does a room addition take?

Three to six months including permit review. LADBS plan check is usually the longest wait.

Will the addition match the house?

That’s the job. We match roof pitch, eaves, stucco texture, window style and floor level.

Do additions add value?

In the Valley, bedrooms and bathrooms generally do; the exact return depends on the neighborhood and the finish.

More answers on our FAQ page, or browse recent projects and client reviews. Ask about financing options at your walkthrough.

Related services

Further reading

Where we do this work

From our Sherman Oaks office we serve the San Fernando Valley, the Westside and the foothill cities. Popular areas for room additions:

Ready when you are

Room Additions estimates are free and in writing.